FLUKE 27 电路图.pdf
《FLUKE 27 电路图.pdf》由会员分享,可在线阅读,更多相关《FLUKE 27 电路图.pdf(60页珍藏版)》请在收音机爱好者资料库上搜索。
1、 27 Multimeter Service Manual For IEC 61010 CAT III Meters Only PN 690206 November 1998 1998 Fluke Corporation, All rights reserved. Printed in U.S.A. All product names are trademarks of their respective companies. RadioFans.CN 收音机爱 好者资料库 RadioFans.CN 收音机爱 好者资料库 i Table of Contents ChapterTitlePage
2、1Introduction and Specifications. 1-1 1-1.Using the Meter Safely . 1-3 1-2.Operating Instructions . 1-4 1-3.Specifications . 1-5 2Theory of Operation . 2-1 2-1.Introduction . 2-3 2-2.Functional Description . 2-3 2-3.Block Diagram Description . 2-4 2-4.Input Overload Protection . 2-4 2-5.Function Swi
3、tching Circuits . 2-4 2-6.Signal Conditioning Circuits . 2-4 2-7.Custom Analog IC (U1) . 2-4 2-8.Peripherals to U1 . 2-6 2-9.Microcomputer Control . 2-6 2-10.Display . 2-7 3Maintenance. 3-1 3-1.Introduction . 3-3 3-2.Service Information . 3-4 3-3.Operator Maintenance . 3-4 3-4.Battery Replacement .
4、3-5 3-5.Fuse Test . 3-6 3-6.Fuse Replacement . 3-6 3-7.General Maintenance Information . 3-7 3-8.Handling Precautions for Static-Sensitive Devices . 3-7 3-9.Disassembly . 3-7 3-10.Reassembly . 3-10 3-11.Cleaning . 3-12 3-12.Performance Tests . 3-12 3-13.Display Test . 3-12 3-14.Voltage Functions Per
5、formance Verification . 3-13 3-15.AC and DC Current Performance Verification . 3-13 3-16.Ohms Function Performance Verification . 3-14 RadioFans.CN 收音机爱 好者资料库 27 Service Manual ii 3-17.Diode Test Performance Verification . 3-15 3-18.Calibration Adjustment . 3-15 3-19.Calibration Preparation . 3-15 3
6、-20.DC Voltage Connection . 3-16 3-21.AC Voltage Calibration . 3-16 3-22.Troubleshooting . 3-17 3-23.Power-Up Self Test . 3-17 3-24.Overall System Check . 3-17 3-25.DC Voltage Signal Tracing . 3-18 3-26.Fault Diagnosis Guide . 3-19 4List of Replaceable Parts. 4-1 4-1.Introduction . 4-3 4-2.How to Ob
7、tain Parts . 4-3 4-3.Manual Status Information . 4-3 4-4.Newer Instruments . 4-4 4-5.Service Centers . 4-4 4-6.Parts Lists . 4-5 5Schematic Diagrams . 5-1 iii List of Tables TableTitlePage 1-1.Specifications. 1-5 3-1.Recommended Test Equipment . 3-3 3-2.Replacement Fuses. 3-6 3-3.Ohm Function Perfor
8、mance Test. 3-15 3-4.Fault Diagnosis Guide. 3-19 4-1.Final Assembly . 4-6 4-2.A1 Main PCA . 4-8 4-3.A2 Digital PCA. 4-11 27 Service Manual iv v List of Figures FigureTitlePage 3-1.Battery and Fuse Replacement. 3-5 3-2.Disassembly. 3-8 3-3.Calibration Adjustment Locations . 3-16 4-1.Final Assembly .
9、4-7 4-2.A1 Main PCA . 4-10 4-3.A2 Digital PCA. 4-11 5-1.A1 Main PCA and A2 Digital PCA. 5-3 27 Service Manual vi 1-1 Chapter 1 Introduction and Specifications TitlePage 1-1.Using the Meter Safely. 1-3 1-2.Operating Instructions. 1-4 1-3.Specifications. 1-5 27 Service Manual 1-2 Introduction and Spec
10、ifications Using the Meter Safely1 1-3 1-1. Using the Meter Safely Use the meter as described in this manual. Otherwise the safety features provided by the meter might be impaired. A Warning identifies conditions and actions that pose hazards to the user; a Caution identifies conditions and actions
11、that might damage the meter. Read First: Safety Information. Read First: Safety Information This meter complies with EN 61010-1:1993, ANSI/ISA S82.01- 1994 and CAN/CSA C22.2 No. 1010.1-92 Overvoltage Category III. Use the meter only as specified in the Users Manual, otherwise the protection provided
12、 by the meter may be impaired. Warning To avoid possible electric shock or personal injury: Do not use the meter if it is damaged. Before use, inspect the case for cracks or missing plastic. Pay particular attention to the insulation surrounding the connectors. Inspect the test leads for damaged ins
13、ulation or exposed metal. Check test lead continuity. Replace damaged leads. Do not use the meter if it operates abnormally. Protection may be impaired. When in doubt, have the meter serviced. Do not operate the meter around explosive gas, vapor or dust. Do not apply more than the rated voltage, as
14、marked on the meter, between terminals or between any terminal and earth ground. Before each use, verify the meters operation by measuring a known voltage. When servicing the meter, use only specified replacement parts. Use caution when working above 30 V ac rms, 42 V ac peak, or 60 V dc. Such volta
15、ges pose a shock hazard. Keep your fingers behind the finger guards on the probe when making measurements. Connect the common test lead before connecting the live test lead. Disconnect the live test lead first. Remove test leads from the meter before opening the battery door. Make sure the battery d
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FLUKE 27 电路图
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


