AN-URM-157A_test_harness_serv_user_TM11-6625-622-12_1976.pdf
《AN-URM-157A_test_harness_serv_user_TM11-6625-622-12_1976.pdf》由会员分享,可在线阅读,更多相关《AN-URM-157A_test_harness_serv_user_TM11-6625-622-12_1976.pdf(64页珍藏版)》请在收音机爱好者资料库上搜索。
1、Changes in force: C1, C2, C3, and C4 CH A N G E NO. 4 TM 11-6625-622-12 C 4 HEADQUARTERS DEPARTMENT OF THE ARMY WASHINGTON, D.C., 28 December 1976 Operators and Organizational Maintenance Manual Including Repair Parts and Special Tools List TEST HARNESS, RADIO SET AN/URM-157 (NSN 6625-00-766-4685) A
2、ND AN/URM-157A (NSN 6625-00-236-1557) TM 11-6625-622-12, 10 December 1964, is changed as follows: The title is changed as indicated above. Page 3, paragraph 1-3. Delete subparagraphs b and c and substitute: b. Report of Packaging and Handling Deficien- cies. Fill out and forward DD Form 6 (Packaging
3、 Im- provement Report) as prescribed in AR 700-58/ NAVSUPINST 4030.29/AFR71-13/MCO P4030.29A, and DSAR 4145.8. c. Discrepancy in Shipment Report (DISREP) (SF 361). Fill out and forward Discrepancy in Shipment Report (DISREP) (SF361) as prescribed in AR 55-38/ NAVSUPINST 4610.33A/AFR 75-18/MCO P4610.
4、19B, and DSAR 4500.15. Paragraph 1-3-1. Delete paragraph 1-3.1 and sub- stitute: 1-3.1.Reporting of Errors The reporting of errors, omissions, and recommenda- tions for improving this publication by the individu- al user is encouraged. Reports should be submitted on DA Form 2028 (Recommended Changes
5、 to Publi- cations and Blank Forms) and forwarded direct to Commander, US Army Electronics Command, ATTN: DRSEL-MA-Q Fort Monmouth, NJ 07703. 1-3.2. Reporting Equipment Improve- ment Recommendations (EIR) EIR will be prepared using DA Form 2407 (Main- tenance Request). Instructions for preparing EIR
6、s are provided in TM 38-750, the Army Maintenance Management System. EIRs should be mailed direct- ly to Commander, US Army Electronics Command, ATTN: DRSEL-MA-Q, Fort Monmouth, NJ 07703. A reply will be furnished directly to you. Page 25, appendix II. Delete appendix II and sub- stitute: APPENDIX I
7、I MAINTENANCE ALLOCATION Section I.INTRODUCTION A2-1. GeneralA2-2. Maintenance Function This appendix provides a summary of the mainte- nance operations for AN/URM-157 and AN/URM- 157A. It authorizes categories of maintenance for specific maintenance functions on reparable items and components and t
8、he tools and equipment re- quired to perform each function. This appendix may be used as an aid in planning maintenance operations. Maintenance functions will be limited to and defined as follows: a. Inspect. To determine the serviceability of an item by comparing its physical, mechanical, and/or el
9、ectrical characteristics with established standards through examination. b. Test. To verify serviceability and to detect incip- ient failure by measuring the mechanical or electri- This reprint contains the basic 1 p u b l i c a t i o n d a t e d 1 0 D e c e m b e r 1 9 6 4 a n d c h a n g e s 1 t h
10、 r o u g h 4 . cal characteristics of an item and comparing those characteristics with prescribed standards. c. Service. Operations required periodically to keep an item in proper operating condition, i.e., to clean, preserve, drain, paint, or to replenish fuel/lu- bricants/hydraulic fluids or compr
11、essed air supplies. d. Adjust. Maintain within prescribed limits by bringing into proper or exact position, or by setting the operating characteristics to the specified para- meters. e. Align. To adjust specified variable elements of an item to about optimum or desired performance. f. Calibrate. To
12、determine and cause corrections to be made or to be adjusted on instruments or test measuring and diagnostic equipment used in preci- sion measurement. Consists of the comparison of two instruments, one of which is a certified standard of known accuracy, to detect and adjust any dis- crepancy in the
13、 accuracy of the instrument being compared. g. Install. The act of emplacing, seating, or fixing into position an item, part, module (component or assembly) in a manner to allow the proper func- tioning of the equipment/system. h. Replace. The act of substituting a serviceable like-type part, sub-as
14、sembly, model (component or assembly) for an unserviceable counterpart. i. Repair. The application of maintenance services (inspect, test, service, adjust, align, calibrate, re- place) or other maintenance actions (welding, grind- ing, riveting, straightening, facing, remachining, or resurfacing) to
15、 restore serviceability to an item by correcting specific damage, fault, malfunction, or failure in a part, subassembly, module/component/ assembly, end item or system. This function does not include the trial and error replacement of running spare type items such as fuses, lamps, or electron tubes.
16、 j. Overhaul. That periodic maintenance effort (service/action) necessary to restore an item to a com- pletely serviceable/operational condition as pre- scribed by maintenance standards (e.g., DMWR) in appropriate technical publications. Overhaul is nor- mally the highest degree of maintenance perfo
17、rmed by the Army. Overhaul does not normally return an item to like-new condition. k. Rebuild. Consists of those services/actions nec- essary for the restoration of unserviceable equipment to a like-new condition in accordance with original manufacturing standards. Rebuild is the highest degree of m
18、aterial maintenance applied to Army equipment. The rebuild operation includes the act of returning to zero those age measurements (hours, miles, etc) considered in classifying Army equip- ment/components. A2-3. Column Entries a. Column 1, Group Number. Column 1 lists group numbers, the purpose of wh
19、ich is to identify components, assemblies, subassemblies and modules with the next higher assembly. b. Column 2, Component/Assembly. Column 2 contains the noun names of components, assemblies, subassemblies, and modules for which maintenance is authorized. c. Column 3, Maintenance Functions. Column
20、3 lists the functions to be performed on the item listed in column 2. When items are listed without main- tenance functions, it is solely for purpose of having the group numbers in the MAC and RPSTL coincide. d. Column 4, Maintenance Category. Column 4 specifies, by the listing of a “worktime” figur
21、e in the appropriate subcolumn(s), the lowest level of main- tenance authorized to perform the function listed in column 3. This figure represents the active time re- quired to perform that maintenance function at the indicated category of maintenance. If the number or complexity of the tasks within
22、 the listed maintenance function vary at different maintenance categories, appropriate “worktime” figures will be shown for each category. The number of task-hours specified by the “worktime” figure represents the average time required to restore an item (assembly, subassembly, component, module, en
23、d item or system) to a service- able condition under typical field operating condi- tions. This time includes preparation time, trouble- shooting time and quality assurance/quality control time in addition to the time required to perform the specific tasks identified for the maintenance func- tions
24、authorized in the maintenance allocation chart. Subcolumns of column 4 areas follows: C Operator/Crew O Organizational F Direct Support H General Support D Depot e. Column 5, Tools and Equipment. Column 5 specifies by code, those common tool sets (not indi- vidual tools) and special tools, test, and
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AN URM 157 A_test_harness_serv_user_TM11 6625 622 12 _1976
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
链接地址:http://www.radiofans.cn/p-197784.html



Marshall-9100-62-02-Schematic电路原理图.pdf


