Vertex_VX-2500V_serv.pdf
《Vertex_VX-2500V_serv.pdf》由会员分享,可在线阅读,更多相关《Vertex_VX-2500V_serv.pdf(41页珍藏版)》请在收音机爱好者资料库上搜索。
1、1 VHF FM Transceiver VX-2500V Service Manual Introduction This manual provides technical information necessary for servicing the VX-2500V Transceiver. Servicing this equipment requires expertise in handling surface-mount chip components. Attempts by non-qualified persons to service this equipment ma
2、y result in permanent damage not covered by the warranty, and may be illegal in some countries. Two PCB layout diagrams are provided for each double-sided circuit board in the transceiver. Each side of thr board is referred to by the type of the majority of components installed on that side (“leaded
3、” or “chip-only”). In most cases one side has only chip components, and the other has either a mixture of both chip and leaded components (trimmers, coils, electrolytic capacitors, ICs, etc.), or leaded components only. While we believe the technical information in this manual to be correct, Vertex
4、Standard assumes no liability for damage that may occur as a result of typographical or other errors that may be present. Your cooperation in pointing out any inconsistencies in the technical information would be appreciated. Specifications . 2 DSUB 9-pin Accessory Connector. 3 Exploded View realign
5、ment should not be done until after the faulty component has been replaced. We recommend that servicing be performed only by au- thorized Vertex Standard service technicians who are ex- perienced with the circuitry and fully equipped for repair and alignment. Therefore, if a fault is suspected, cont
6、act the dealer from whom the transceiver was purchased for instructions regarding repair. Authorized Vertex Standard service technicians realign all circuits and make complete performance checks to ensure compliance with factory specifications after replacing any faulty components. Those who do unde
7、rtake any of the following alignments are cautioned to proceed at their own risk. Problems caused by unauthorized attempts at realignment are not covered by the warranty policy. Also, Vertex Standard reserves the right to change circuits and alignment proce- dures in the interest of improved perform
8、ance, without notifying owners. Under no circumstances should any alignment be attempt- ed unless the normal function and operation of the trans- ceiver are clearly understood, the cause of the malfunc- tion has been clearly pinpointed and any faulty compo- nents replaced, and realignment determined
9、 to be abso- lutely necessary. The following test equipment (and thorough familiarity with its correct use) is necessary for complete realignment. Correction of problems caused by misalignment result- ing from use of improper test equipment is not covered under the warranty policy. While most steps
10、do not re- quire all of the equipment listed, the interactions of some adjustments may require that more complex adjustments be performed afterwards. Do not attempt to perform only a single step unless it is clearly isolated electrically from all other steps. Have all test equipment ready before beg
11、inning, and follow all of the steps in a section in the order presented. Required Test Equipment ? RF Signal Generator with calibrated output level at 500MHz ? Deviation Meter (linear detector) ? In-line Wattmeter with 5% accuracy at 1000MHz ? 50 RF Dummy Load with power rating 100W at 500MHz ? 4 AF
12、 Dummy Load ? Regulated DC Power Supply (standard 13.8V DC, 15A) ? Frequency Counter with 0.1ppm accuracy at 500MHz ? AC Voltmeter ? DC Voltmeter ? VHF Sampling Coupler ? IBM PC/ compatible Computer ? Oscilloscope ? Vertex Standard VPL-1 Connection Cable & Alignment program Alignment Preparation & P
13、recautions A 50 RF Dummy Load and in-line wattmeter must be connected to the main antenna jack in all procedures that call for transmission, except where specified otherwise. Correct alignment is not possible with an antenna. After completing one step, read the following step to de- termine whether
14、the same test equipment will be required. If not, remove the test equipment (except dummy load and wattmeter, in connected) before proceeding. Correct alignment requires that the ambient temperature be the same as that of the transceiver and test equipment, and that this temperature be held constant
15、 between 68F and 86F (20C 30C). When the transceiver is brought into the shop from hot or cold air, it should be allowed time to come to room temperature before alignment. Whenever possible, alignments should be made with os- cillator shields and circuit boards firmly affixed in place. Also, the tes
16、t equipment must be thoroughly warmed up before beginning. Note: Signal levels in dB referred to in the alignment pro- cedure are based on 0dBm EMF = 0.5mV. 12 Setup the test equipment as shown below, apply 13.8V DC power to the transceiver. The transceiver must be programmed for use in the in- tend
17、ed system before alignment is attempted. The RF pa- rameters are loaded from the file during the alignment process. PLL VCV ? Connect the positive lead of the DC voltmeter to the test point TP1007 (VCV) on the RF-Unit, as indicated in the figure, and the negative lead to chassis ground. ? Set the tr
18、ansceiver to the high band edge fre- quency channel, then adjust coil L1017 on the Unit for 7.25V on the voltmeter. ? Key the transmitter, and adjust coil L1020 on the Unit for 7.25V on the voltmeter. ? Next select to the low edge frequency channel and confirm above 2.00V to 3.00V on the volt- meter
19、. ? Key the transmitter, and confirm above 2.00V to 3.00V on the voltmeter. PLL Reference Frequency With the wattmeter, dummy load and frequency counter connected to the antenna jack, and select band center fre- quency channel, key the transmitter and adjust VR1001 on the RF-Unit, if necessary, so t
20、he counter frequency is within 100 Hz of the channel center frequency for the trans- ceiver version. Alignment Important In order to facilitate alignment over the complete switch- ing range of the equipment it is recommended that the channel data in the transceiver is preset as the chart be- low. RF
21、 Unit Test & Alignment Points TP1007 L1017 L1020 VR1001 Transceiver The alignment mode is accessed by “Alignment mode” command from the computer whilst switching on. And it is operated by the alignment tool automatically. During the alignment mode, normal operation is suspend- ed. Use the alignment
22、tool program running on PC. CHANNEL CH 1 CH 2 CH 3 CH 4 CHANNEL SPACE Wide Narrow Wide Wide Version A 147.100 MHz 147.100 MHz 134.100 MHz 159.900 MHz Ver. C 161.100 MHz 161.100 MHz 148.100 MHz 173.900 MHz FREQUENCY (SIMPLEX) 13 The alignment tool outline Installation the tool This alignment tool con
23、sists, MS-DOS based, only one ex- ecute file “svc47.exe.“ You make a directly as you think fit, and copy this file. That is all of the installation pro- cess. Boot the tool Change directly and input in command line, “svc47 en- ter,“ and boot the alignment tool. Preparation Setup the test equipment a
24、s “Alignment Preparation & Precautions.” Set the RF Ch. List to Table 1 on the CE47 Clone editor software. Enter to the alignment mode To enter the alignment mode, press “0 Alignment Mode” on the personal computer Key board. You turn off the power of the transceiver, and turn on the transceiver. If
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Vertex_VX 2500 V_serv
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


