FT-250R_SM.pdf
《FT-250R_SM.pdf》由会员分享,可在线阅读,更多相关《FT-250R_SM.pdf(33页珍藏版)》请在收音机爱好者资料库上搜索。
1、2009 VERTEX STANDARD CO., LTD. EH038N90A Technical Supplement Specifications.2 Exploded View Standby, Saver off : 38 mA Standby, Saver on : 23 mA Auto Power Off : 8 mA Transmit(HIGH) : 1.3 A; (MID) : 900 mA; (LOW) : 500 mA; Operating Temperature:4 to 140 F (20 C to +60 C) Case size (WHD):2.3 (W) x 4
2、.3 (H) x 1.1 (D) (58 x 108.5 x 26.5 mm) (w/o knob check with your dealer. 3FT-250R Technical Supplement Exploded View a 450 kHz second IF is produced when this signal is mixed with the first IF signal within Q1017. The second IF then passes through the main selectivity element, ceramic filter CF1001
3、 (CFWM450E) to strip away all but the desired signal; it is then applied to the limiter amplifier in Q1017, which removes amplitude variations in the 450kHz IF, before detection of the speech by the ceramic discriminator CD1001 (JTBM450CX24). Detected audio from Q1017 is applied to a low-pass filter
4、 consisting of capacitors C1208, C1209 it is then passed through the de- emphasis network consisting of capacitor C1057 and re- sistor R1208 to a high-pass filter consisting of capacitors C1058, C1059 it is then delivered to D1010 (HSC277) for frequency mod- ulation of the PLL carrier (up to 5kHz fr
5、om the unmod- ulated carrier) at the transmitting frequency. If an external microphone is used, PTT switching is con- trolled by Q1054 (UMZ2N), which signals the micropro- cessor Q1035 when the impedance at the microphone jack drops. If a CDCSS code is enabled for transmission, the code is generated
6、 by microprocessor Q1035 and delivered to D1015 (HVC350B) for CDCSS modulating. If DTMF is enabled for transmission, the tone is generat- ed by the microprocessor Q1035 and applied to the splat- ter filter section in place of the speech audio. Also, the tone is amplified for monitoring in the loudsp
7、eaker. The modulated signal from the VCO Q1023 (2SC5374) is buffered by Q1022 and Q1018 (both 2SC5374). The low- level transmit signal is amplified by Q1010 (2SC5226-5) and Q1009 (2SK3074); it is then applied to the final am- plifier Q1008 (RD07MVS1A), which provides up to 5 watts output power. The
8、transmit signal then passes through the antenna switch D1001 (RLS135) and is low-pass filtered to sup- press harmonic spurious radiation before delivery to the antenna. Automatic Transmit Power Control Drain current of the final amplifier Q1008 (RD07MVS1A) is sampled by R1028 and R1035. The resultin
9、g DC is fed back through the APC amplifier Q1003 (NJM2904V) to the driver amplifier Q1009 (2SK3074) and final amplifi- er Q1008, for control of the power output. The microprocessor selects either “High” or “Low” pow- er levels. Transmit Inhibit When the PLL is unlocked, pin 7 of PLL subsystem IC Q10
10、30 (MB15A01PFV1) goes to a logic “Low.” The re- sulting DC unlock control voltage is passed through the inversion amplifier Q1032 (2SA1774) to pin 8 of the mi- croprocessor Q1035. While the PLL is unlocked, pin 15 of Q1035 remains “Low,” disabling the gate voltages of driv- er amplifier Q1009 (2SK30
11、74) and final amplifier Q1008 (RD07MVS1A), thereby disabling the transmitter. Spurious Suppression Generation of spurious products by the transmitter is minimized by the fundamental carrier frequency being equal to final transmitting frequency, modulated directly in the transmit VCO. Additional harm
12、onic suppression is provided by a low-pass filter consisting of coils L1001, L1002, L1003, L1006, L1007 realignment should not be done until after the faulty component has been replaced. We recommend that servicing be performed only by au- thorized Vertex Standard service technicians who are ex- per
13、ienced with the circuitry and fully equipped for repair and alignment. If a fault is suspected, contact the dealer from whom the transceiver was purchased for instruc- tions regarding repair. Authorized Vertex Standard ser- vice technicians realign all circuits and make complete per- formance checks
14、 to ensure compliance with factory spec- ifications after replacing any faulty components. Those who do undertake any of the following alignments are cautioned to proceed at their own risk. Problems caused by unauthorized attempts at realignment are not covered by the warranty policy. Also, Vertex S
15、tandard reserves the right to change circuits and alignment proce- dures in the interest of improved performance, without notifying owners. Under no circumstances should any alignment be attempt- ed unless the normal function and operation of the trans- ceiver are clearly understood, the cause of th
16、e malfunc- tion has been clearly pinpointed and any faulty compo- nents replaced, and realignment determined to be abso- lutely necessary. Required Test Equipment The following test equipment (and familiarity with its use) is necessary for complete realignment. Correction of prob- lems caused by mis
17、alignment resulting from use of im- proper test equipment is not covered under the warranty policy. While most steps do not require all of the equip- ment listed, the interactions of some adjustments may re- quire that more complex adjustments be performed after- wards. Do not attempt to perform onl
18、y a single step unless it is clearly isolated electrically from all other steps. Have all test equipment ready before beginning and, follow all of the steps in a section in the order presented. ? RF Signal Generator with calibrated output level at 200 MHz ? Deviation Meter (linear detector) ? In-lin
19、e Wattmeter with 5% accuracy at 200 MHz ? 50-Ohm 10-W RF Dummy Load ? 8-Ohm AF Dummy Load ? Regulated DC Power Supply adjustable from 3 to 16.5 VDC, 2A ? Frequency Counter: 0.2-ppm accuracy at 200 MHz ? AF Signal Generator ? AC Voltmeter ? DC Voltmeter: high impedance ? VHF Sampling Coupler ? SINAD
20、Meter Alignment Preparation alignment is not possible with an anten- na. After completing one step, read the next step to see if the same test equipment is required. If not, remove the test equipment (except dummy load and wattmeter, if connected) before proceeding. Correct alignment requires that t
21、he ambient temperature be the same as that of the transceiver and test equipment, and that this temperature be held constant between 68 86 F (20 30 C). When the transceiver is brought into the shop from hot or cold air, it should be allowed some time to come to room temperature before alignment. Whe
22、never possible, alignments should be made with os- cillator shields and circuit boards firmly affixed in place. Also, the test equipment must be thoroughly warmed up before beginning. Note: Signal levels in dB referred to in the alignment pro- cedure are based on 0dB = 0.5V. 11FT-250R Technical Supp
23、lement Alignment Test Setup Set up the test equipment as shown below for transceiver alignment, and supply 7.5 V DC power to the transceiver. PLL Reference Frequency ? With the wattmeter, dummy load and frequency counter connected to the antenna jack, select 146 MHz, key the transmitter, and adjust
24、TC1001 on the Main Unit, if necessary, so the counter frequency is within 100 Hz of 146 MHz. “TX SECTION” ALIGNMENT SETUP “RX SECTION” ALIGNMENT SETUP MICGND AF Signal Generator 9.9 V DC Regulated Power Supply RF Sampling Coupler Inline Wattmeter 50-ohms Dummy Load Frequency Counter Frequency Counte
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FT 250 R_SM
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf