Biddle PAT4-Quickstart 电路图.pdf
《Biddle PAT4-Quickstart 电路图.pdf》由会员分享,可在线阅读,更多相关《Biddle PAT4-Quickstart 电路图.pdf(12页珍藏版)》请在收音机爱好者资料库上搜索。
1、 PAT4 Quick-Start Guide. Terminology. Megger Limited, the PAT4 and all its associated software use a common verbal language in descriptions and instructions in an attempt to avoid confusion. Hopefully it is all logical and makes sense, so here are a few terms and their explanations. Further details
2、can be found within the User Guide on the pages indicated. Asset 22 Portable electrical appliance under test Asset ID 22 Unique identifier for each asset. 2 clients can use the same Asset IDs, but all Asset IDs within one client must be unique. Client 14 Organisation for whom the testing is being pe
3、rformed Continuity Test 37 Low-Resistance test performed at low current (0.2A) to establish integrity of Earth connection on equipment that could be damaged by the high current Bond test; such as computers. Sometimes referred to as a Soft Test. Download 34 Transfer of data from the PAT4 to the PC Ea
4、rth Bond Test 37 Low-Resistance test performed at high current (10A or 25A) to establish integrity of Earth connection Insulation Test 38 High Resistance test performed at high voltage (500V) to establish integrity of the insulation material Location 17 Branch, Building or Department in which the as
5、set is located Quick-Check 30 Any test performed on an asset which is not stored to memory Repair Code 28 User-designated 3-character codes to identify any work that was or will be necessary to enable the asset to pass. Room ID 22 Secondary identifier for asset location Test Group 19 therefore, if t
6、he metalwork is also at that voltage level (Earthed), no danger exists. Secondary protection will also come in to play here, as when a fault occurs there will be current flowing from Live to Earth via the fault. This will cause any Earth Leakage Trip on the supply to operate, so cutting the power an
7、d removing the danger. RadioFans.CN 收音机爱 好者资料库 PAT4 Quick-Start Guide. So the primary method of protection here is the fact that you cant touch any live parts, but equally important is that any exposed metalwork is properly Earthed. Further to this, if there is a slight (high resistance) fault betwe
8、en Live or Neutral and Earth, the likelihood is that the fault will develop into something worse, possibly causing a fire or electrocution. The PAT4 DV will prompt or test for all of these dangers. Visual inspection. Does it look OK? The most important part of any test and the one that shows up the
9、most failures is the Visual Inspection. If the asset is obviously dangerous, it should not be plugged in until it has been repaired. In fact, if the asset fails any test, it should be unplugged immediately and no further testing should take place until it is repaired. It is also important that all t
10、ests are performed in the recommended sequence such that faults are identified at the earliest opportunity. Is the case damaged? Is the plug OK? The lead? The main power switch? Is the supply socket OK? Should there be a problem, all of these questions are asked by the PAT4 to act as an aide-memoir
11、while checking, and give the opportunity to log any faults or areas of concern. In addition, it also asks other application type questions such as is the equipment suitable for the task to which it is being put? Is the environment OK i.e. is the equipment designed to be used indoors, when it is actu
12、ally being used outside in the rain? Electrical testing. This is only intended as a get-you-going-guide, and it is essential that all safety warnings in the front of the User Guide be read first. Similarly, further explanations on all sections here can also be found within the User Guide. Test Crite
13、ria As with any of the specifics around Portable Appliance Testing, the actual test currents and voltages used, and the pass/fail levels for each test are ultimately the decision of the PAT4 Operator (or his Employer), following guidance from the IEE Code of Practice for In-Service Inspection and Te
14、sting of Electrical Equipment. The PAT4 has the ability to store those criteria into memory, such that all equipment of a similar type can be tested to the same levels. When entering asset details, a Test Group is chosen and associated with that piece of equipment. Earthing 37 The integrity of the E
15、arth connection is checked using different test currents depending on the type of equipment under test and its fuse rating. This should produce a low value, measured in Ohms. Some equipment that uses Switch Mode Power Supplies (typically Personal Computers etc) could become damaged by the high curre
16、nts used during the standard Earth Bond Test, so a low current test at about 0.2A is allowed. This is a Continuity Test, sometimes referred to as a Soft Test. In order to perform a Bond test, both ends of the circuit must be accessible and connected. Taking the trusty steam iron, one end is the Eart
17、h pin on the mains plug, the other is the sole plate. The whole point of this test is to ensure that they are both electrically bonded together. So, the connection for the Earth pin is through the socket on the front panel of the PAT, where it plugs in. The sole plate will require an additional test
18、 lead to complete the test path back to the PAT4. This is the Earth Bond Test Lead, and connects to a terminal on the PAT4. When testing Extension Leads, the far-end connection is made through the IEC-Socket on the front of the PAT4. Short adaptors are available to connect other types of lead to tha
19、t socket. RadioFans.CN 收音机爱 好者资料库 PAT4 Quick-Start Guide. Insulation 38 Any faulty connection between Live (or Neutral) and Earth is more likely to show when tested using a high test-voltage as the insulation material is more highly stressed. Therefore the Insulation Test is performed at 500V d.c. F
20、or those assets which are not Earthed (Class 2, Double-Insulated) there is no Earth point to perform the Insulation Test between. Therefore, an additional test lead is required to connect to any exposed metal on the asset. The same lead and terminal as used during the Bond Test is used here, probing
21、 on to assembly screws or other metalwork present. Like the high currents used in Earth Bond, the high d.c. voltage used in this test may damage some assets such as computers. Because of this, the Insulation Test may be replaced with an Earth or Touch Leakage Test performed during the Operation Test
22、. Operation 38 The asset should never be run at operating voltage if any of the previous tests have indicated a failure. During the operation test, various measurements are taken including the VA (Volts x Amps) rating to check the power drawn from the supply, and a Touch-Leakage Test. This compares
23、the current in to the asset against the current out through the Neutral line, and any imbalance is reported as Earth Leakage. Flash (PAT4 DVF only) 40 It is not recommended that Flash Tests be routinely performed on assets. The Flash Test deliberately over-stresses the Insulation Materials to encour
24、age breakdown of any weak-points in the assembly, using 1.5kV (Class 1) and 3kV (Class 2) a.c. voltages. Over-stressing the insulation will cause premature ageing, so routine testing will cause the asset to fail much earlier in its life than would normally be expected. The facility is there to enabl
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Biddle PAT4-Quickstart 电路图 PAT4 Quickstart
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


