EMCO 3140 Instruction 电路图.pdf
《EMCO 3140 Instruction 电路图.pdf》由会员分享,可在线阅读,更多相关《EMCO 3140 Instruction 电路图.pdf(24页珍藏版)》请在收音机爱好者资料库上搜索。
1、 EMC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 Model 3140 BiConiLog Antenna MANUAL RadioFans.CN 收音机爱 好者资料库 MODEL 3140 BICONILOG ANTENNA EMC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 EMC Test Systems, L.P. reserves the right to make changes to any product described herein in order to improve
2、function, design or for any other reason. Nothing contained herein shall constitute EMC Test Systems, L.P. assuming any liability whatsoever arising out of the application or use of any product or circuit described herein. EMC Test Systems, L.P. does not convey any license under its patent rights or
3、 the rights of others. Copyright 2002 by EMC Test Systems, L.P. All Rights Reserved. No part of this document may be copied by any means without written permission from EMC Test Systems, L.P. E-MAIL with both hands, rotate the antenna and bow-tie into a vertical position resting on a flat surface (s
4、ee Figure 2). The antenna can now rest by itself on the feet of the balun box, and the bottom edge of the bow-tie elements. FIGURE 2 - Assembly Steps 2 through 4 Step 3. Attach the other bow-tie element to the antenna balun box (see Figure 2). The antenna should rest on the balun end and stand verti
5、cally to attach the 2nd bow-tie with the opposite hand knob. Step 4. The long T leg elements are installed and clamped to the bow-ties (Figure 2) with the antenna standing vertical. Assembly Instructions MODEL 3140 BICONILOG ANTENNA 6 EMC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 Step 5. The fou
6、r diagonal struts should be installed. Loosen the thumbscrews at the mount on the T legs and at the boom mounts to install the strut ends. Place the pocket of the straight end facing the raised face of each mount and tighten the thumbscrew to lock in place (see Figure 3). FIGURE 3 Assembly Step 5 MO
7、DEL 3140 BICONILOG ANTENNA Assembly Instructions EMC TEST SYSTEMS, L.P. MARCH 2002 7 REV C PN 399258 Step 6. The V elements should be installed and tightened using the thumbscrews through the boom (see Figure 4). FIGURE 4 Assembly Step 6 The antenna is now ready for mounting on a boom of a stand suc
8、h as the ETS-Lindgren 7-TR or mast such as the ETS-Lindgren 2070 series. See the next section “Mounting Instructions” for more details. Mounting Instructions MODEL 3140 BICONILOG ANTENNA 8 EMC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 MOUNTING INSTRUCTIONS The Model 3140 boom has dual mounting b
9、rackets that are spaced 8” on center. The dual mounts make the Model 3140 very stable on a boom when polarizing and moving up and down a mast. Step 1. Install the antenna adapters onto the two mount brackets on the antenna boom (see Figure 5). These have a 7/8” threaded hole for an ETS-Lindgren moun
10、t knob. Install the threaded insert adapter into the 7/8” hole if a ” thread is required on the mounting stand or mast. FIGURE 5 Attachment of antenna mount adapters to Model 3140 MODEL 3140 BICONILOG ANTENNA Mounting Instructions EMC TEST SYSTEMS, L.P. MARCH 2002 9 REV C PN 399258 Step 2. The anten
11、na can be mounted on standard ETS-Lindgren perforated cross booms using two 7/8” mount knobs through the 2” square boom (see Figure 6). FIGURE 6 Attachment of Model 3140 to perforated offset boom. The antenna can be mounted to the 2” square booms of the following ETS-Lindgren products: Model 7-TR tr
12、ipod stand (see Figure 7), Model 2075 MiniMast tower (see Figure 8), and Model 2070/2071 towers (see Figure 9). For other 2” square booms, two slip-on boom brackets that do not require through holes in the boom can be used to mount the antenna. Mounting Instructions MODEL 3140 BICONILOG ANTENNA 10 E
13、MC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 FIGURE 7 Attachment of Model 3140 to Model 7-TR heavy duty antenna stand FIGURE 8 Attachment of Model 3140 to Model 2075 MiniMast MODEL 3140 BICONILOG ANTENNA Mounting Instructions EMC TEST SYSTEMS, L.P. MARCH 2002 11 REV C PN 399258 FIGURE 9 Attachme
14、nt of Model 3140 to Model 2070 or 2071 Tower Application MODEL 3140 BICONILOG ANTENNA 12 EMC TEST SYSTEMS, L.P. MARCH 2002 REV C PN 399258 APPLICATION Assemble and mount the Model 3140 per the instructions in the previous sections. Connect an N-type coaxial cable from the antenna connector to a sign
15、al generator or amplifier. Contact with any metal or non-metallic structure can capacitively load the antenna, which may cause unrepeatable results. Therefore, care must be taken to ensure that no part of the dipole elements or bow-ties are in contact with the tripod or tower, particularly in vertic
16、ally- polarized tests. Where possible, run the feed cable straight back at least 1 meter or more from the Model 3140 before dropping vertically. Both horizontal and vertical polarization is easily accomplished when the Model 3140 is mounted on an ETS-Lindgren tower. The Model 7-TR tripod is designed
17、 specifically for the T bow-tie BiConiLog antennas to allow easy polarization changes, and with the air polarization option can provide automated polarization using a Model 2090 controller. The previous section “Mounting Instructions” shows the mounting scheme for both ETS-Lindgren towers and the 7-
18、TR tripod. For immunity testing, the electric field strength generated at a distance d can be approximated by the formula ()E Pg d V / m = 30 where d is in meters, g is the numeric gain (10GdB/10, see attached calibration data), and P is antenna net input power in Watts. An estimate of the power req
19、uired for any MODEL 3140 BICONILOG ANTENNA Application EMC TEST SYSTEMS, L.P. MARCH 2002 13 REV C PN 399258 field strength E can be obtained from Figure 12 or 13 in the Typical Data section below, which shows forward power required in Watts to generate 1 V/m. Note that while the formula provided abo
20、ve is based on the net power (forward minus reflected) transmitted by the antenna, the gain determined from the antenna factor already contains effects due to mismatch, so the formula then predicts the required forward power rather than net power. To determine the power (in Watts) required for any o
21、ther field strength not shown, multiply the power required for 1 V/m by the desired E-field squared, or ()()P EE PV / mV / m= 2 1 To determine the additional amplifier overhead required to handle 80% amplitude modulation, multiply the result by 3.24 (1.82). Actual transmitted field strength should b
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EMCO 3140 Instruction 电路图
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


