Fluke B0127-FlukeAddtionalOperationManual 电路.pdf
《Fluke B0127-FlukeAddtionalOperationManual 电路.pdf》由会员分享,可在线阅读,更多相关《Fluke B0127-FlukeAddtionalOperationManual 电路.pdf(6页珍藏版)》请在收音机爱好者资料库上搜索。
1、Dialog BOi27 9010A Micro-System Troubleshooter Avoiding Potential Problems When Getting Started Introduction This document is intended to be used in conjunction with the 9010A Operators Manual when getting started on troubleshooting your own system. It is not intended to be a substitute for the manu
2、al. This document covers common precautions to be observed and the error messages you may encounter when plugging the 9010A interface into your unit- under-test (UUT) for the first time. More detailed information is contained in your Operators Manual. Should applications assistance be necessary, ple
3、ase contact your Fluke Sales Engineer. 收音机爱好者资料库 Ra d i o Fa n s .CN Table of Contents I. INITIAL CONSIDERATIONS A.Starting Off With a Known Good UUT B. Multiple Processor Systems C, Systems With Watchdog Timers D. Multiple-Page Memories E.I/O Ports Connected To Active Stimulus F. Enableable Lines G
4、. Warning II. INITIAL SETUP A. B. C. D. E. F. G. H. f : III. LEARN A. B. IV. VIEW A . B. c. D. Fail On Power Up Pod Self-Test Fail Pod Time Out UUT Power Fail Bad Power Supply Active Forcing Line Active Interrupts Control Error Address-Bit Tied Data-Bit Tied Learn Fail Fatal Abort Finding Nothing Fi
5、nding Many Small I/O Sections Does Not Find All I/O Locations False ROM V. PREPROGRAMMED TESTS A. Control Error B. Address Error C. Data Error D. Read/Write Error E. RAM-Bits Tied F. RAM Decode Error G. RAM Pattern Error H. ROM Error I. Initial Considerations Before starting, there are a few importa
6、nt points to consider with regard to the 9010A and its interaction with your system. While most users will find that they can begin troubleshooting with no extraordinary efforts, some special purpose designs and applications may require special handling. The user needs to be aware of these situation
7、s and how to handle them. A. B. C. Starting Off With a Known Good Unit- Under-Test (UUT) When documentation is unavailable or it is desired that the LEARN feature be used, it is important that a known good UUT is tested. In the event a faulty UUT is used, false information is likely to be learned. T
8、his occurs since the LEARN algorithm acts upon the information returned from a series of read and write operations. If misinformation is fed into the algorithm, erroneous values are returned. Multiple Processor Systems It is common in todays technology to design a system with multiple processors. In
9、 the typical case where the processors talk to each other through a communication port, the 9010A is easily used by plugging into each processor socket one-by-one and testing up to the communication port. In the less typical case, where processors share memory, additional precautions must be taken.
10、In these cases it is possible that one processor may interfere with the task being performed by the other. While handshake lines generally insure that two processors are not on the bus at the same time, one processor may corrupt data in memory, and prevent the other processor from successfully perfo
11、rming a test such as a RAM test. In these rare cases, it is necessary for the user to somehow prevent the two processors from accessing the same memory locations. This may be done by tying a line on the UUT or possibly by WRITING data to a particular location to disable one of the microprocessors. S
12、ystems With Watchdog Timers Systems designed with wdtchciog timers must be individually checked to see what this timer (reset line) is tied to. If the timer is only tied to the processor, it can be 收音机爱好者资料库 Ra d i o Fa n s .CN ignorrd in the SET UP mode. If the timer is tied to devices other than t
13、he processor then it must physically be disabled by tying the lme either high or low. D. Multiple Page Memories Sometimes, one page of memory is not sufficient for system operation. In such cases the designer incorporates multiple pages of memory. The processor switches between these banks or pages
14、in order to properly address them. The LEARN operation is not designed to find these multiple pages of memory. However, the YOlOA can easily test multiple pages of memory. A common technique is to use an l/O port to switch between banks of memory. Using the 9010A WRITE key, the desired bank can be s
15、elected for testing. It is then necessary to select either the ROM TEST or the RAM TEST as appropriate. This sequence of selecting a memory bank through a WRITE and then testing the bank of memory through RAM TEST or ROM TEST can easily be put together b the user in a 9010A program. E.I/O Ports Conn
16、ected To Active Stimulus Due to the series of reads and Lvrites performed by LEARN, Ii0 ports are stimulated when LEARN occurs across those addresses. If this I/O port is connected to a stimulus device, the device ail1 be activated. If this port is connected to a memory device such as a disk drive,
17、then rhe disk c11l very possibly be written on. F. Euableable Lines Sumctimes, enableable lines (such as KEAl)Y and HOLD on the 8080 Microprocessor) interfere with the LEARN procesh. This may occur if, for example, the board IS out of the system, and the board ntxds to be m the system to have READY
18、driven to the actiae state If this is the case, a POD Tl.1EOU? message will appear on the 9010A If this condition occurs, the READY and HOLD lines may be disabled through the SET-Cl- procedure. The SET- (1 menu items on the 8080 are ENABLE READY? and ENABLE HOLD? Answer NO to each of these one at a
19、time and see tvhich one(sl altou the pod and board to function. II. G.Warning Plug the pod into the 901 OA only u hen power is off. Plug the pod into the UUT only when the 9010A is powered on. Failure to do this may cause damage to the pod or the 9010A. Initial Setup After taking into account any of
20、 the:se initial considerations, a brief setup procedure is recommended in order to verify the integrity ot the 9010A and configure the UUT and the 9010A in such a way as to make them complimentaq This is accomplished first by powering up the 9010A which performs a self test on itself, Next, a self t
21、est of the pod is performed bj, locking the pod into the self test socket and pressing BUS TEST on the 9010A. Finally, plug the pod into the UUT and again select BUS TEST. A. B. c. Fail On Power Up When the 9010A is turned on, a if WC is performed verifying its integrity. If the message indicates a
22、failure exists in the 9010A, refer to the service manual or contact your local Fluke Service Center. Pod Self Test Fail If, when performing a pod selt test, the message refers to a pod sell resr tailbre. the pod has failed. Refer to the pod manual or contact your local Fluke Service Center. Pod Time
23、 Out The pod timeout message can CCUI butt) during a pod self test or during operation with a UUT. This message indicates that power at the microprocessor piug IS OK, but the pod IS not communicating Mith the 9010A mainframe. Check first Iu m&c sure that rhe microprocessor plug is plugged in firmly
24、wirh no pin bent under or missing (either into the se&test sucker ur the 171_“I“ During a pod self test, this message means the pod has failed and needs to be bcr iced Occurence of this mrsbage during UL-l operation may signify one of several svmptoms. Again, check to make sure the &roprocessor plug
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Fluke B0127-FlukeAddtionalOperationManual 电路 B0127 FlukeAddtionalOperationManual
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


