1692 Digibridge 电路图.pdf
《1692 Digibridge 电路图.pdf》由会员分享,可在线阅读,更多相关《1692 Digibridge 电路图.pdf(174页珍藏版)》请在收音机爱好者资料库上搜索。
1、1692 RLC Digibridge Instruction Manual Form 1692-0120-00/C2 QuadTech, Inc., 1993 5 Clock Tower Place, 210 East Maynard, Massachusetts, U.S.A. 01754 October, 2000 Telephone 978-461-2100 Sales 800-253-1230 Facimile 978-461-4295 Website The material in this manual is for informational purposes only and
2、 is subject to change, without notice. QuadTech assumes no responsibility for any error or for consequential damages that may result from the misinterpretation of any procedures in this publication. Contents Specifications Warranty Introduction -Section 1 Installation -Section 2 Operation -Section 3
3、 Theory -Section 4 Service and Maintenance -Section 5 Parts Lists and Diagrams -Section 6 RadioFans.CN 收音机爱 好者资料库 These two supplementary pages contain infonnation of improvements or modifications not documented in the current manual. All references to GenRad in the manual now apply to QuadTech, Inc
4、. Page iv -Table of Contents (Parts Lists and Diagrams -Section 6) Power supply assembly, board layout and schematic (pages 6-13 Bins 0 thru 9 (10 lines) ACQ OVER; (1 line) indicates end of data acquistion (component can be moved without affecting measurement results) EOT; (1 line) indicates end of
5、test and that valid bin nwnbers for sorting are available. Outputs are active low (open collector drivers rated at 30 V x. Each will sink 16 mA at 0.4 V. External power and pull-up resistors are required). Handler Inputs: Start; (1 line) To initiate measurement. Input is active low (0V V1 0.4V) and
6、(+2.5V Vh +5V) viii ENVIRONMENT Operating; 0 to 50 degrees C, 1 us, and (if START is not debounced) a-c the settling time or programmed delay. For single measurements, the DUT can be disconnected after e. The selected BIN line goes low at f; the other BIN lines stay high. For AVERAGE measurement rou
7、tines, AOQ OVER goes low (e) at the end of the last measurement . 2.7.2 Timing Figure 2-3. Refer to the accompanying figure for timing guidelines. Notice that START must have a duration of 1 us (minimum) in each state (high and low). If START is provided by a mechanical switch without debounce circu
8、itry, the Digibridge will make many false starts; if START does riot settle down (low) within the default settling time after the first transition to high, the measurement time may increase substantially. Measurement starts at time d, which is essentially the same as time b or c; measurement is comp
9、leted at g. (The START signals are expanded for clarity.) Interval a-e, during which the DUT must remain connected for data acquisition, is considerably shorter than the total measurement time a-g. The DUT can be changed after e (indexing on ACQ, to save time) or after g (indexing on EOT, for a simp
10、ler test setup), as explained below. After the calculation interval e-f, measurement results are available for sorting, i.e., one of the BIN lines goes low. A few micro-seconds later, EOT goes low (can be used to set a latch holding the bin assignment). ACQ OVER, the selected BIN line, and EOT then
11、stays low until the next start command. The time required for measurement depends on test condition, and operating selections. Interval a-e can be less than 15 ms; the cycle a-g can be less than 40 ms; refer to paragraph 3.5 for details. Set up the handler either of two ways: indexing on EOT or inde
12、xing on ACQ, as follows. The handler must supply a signal (here called start next measurement) when it has completed connection of the DUT to the test fixture. 2-6 INSTALLATION Indexing on EOT. Set up the handler to respond to the EOT signal from the Digibridge, which occurs at the end of test, when
13、 the bin assignment is available for sorting. Set up the Digibridge to receive its START signal from the handlers start next measurement signal. This setup is simpler than the one below. NOTE The Digibridge requires that a non-zero value be entered for nominal value to enable generation of the EOT s
14、ignal and indication by the GO/NO-GO lights; see paragraphs 3.8.3,3.8.4. Indexing on ACQ. Set up the handler to respond to the ACQ OVER signal from the Digibridge, which occurs when the data acquisition is complete. The handler can then remove the DUT from the test fixture and replace it with anothe
15、r DUT, while the Digibridge is calculating the result. In addition, set up an interface that provides a START signal to the Digibridge by logical combination of the, EOT signal from the Digibridge AND the start next measurement signal from the handler. Indexing on ACQ results in higher measurement r
16、ate than indexing on EOT. Be sure the TALK switch is set to TALK ONLY, if the IEEE-488 bus is not used. Figure 2-4. Block diagram of a generalized system interconnected by the 16-signalline bus specified in the IEEE Standard 488. Reprinted from Electronics, November 14, 1974; copyright McGraw-Hill,
17、Inc., 1974. INSTALLATION 2-7 2.8 IEEE-488 INTERFACE (OPTION) 2.8.1 Purpose Figure 2-4. If you have the 1658-9620 interface option, you can connect this instrument to a printer or into a system (containing a number of devices such as instruments, apparatus, peripheral devices, and generally a control
18、ler or computer) in which each component meets IEEE Standard 488-1978, Standard Digital Interface for Programmable Instrumentation. A complete understanding of this Standard (about 80 pages) is necessary to understand in detail the purposes of the signals at the IEEE-488 INTERFACE connector on the r
19、ear panel of this instrument. NOTE For copies of the Standard, order IEEE Std 488- 1978, IEEE Standard Digital Interface for Programmable Instrumentation, from IEEE Service Center, Department PB-8, 445 Hoes Lane, Piscataway, N. J. 08854. To make connection to a single device like a printer, use a IE
20、EE-488 cable, which fits the rear-panel connector labeled IEEE-488 INTERFACE. For larger systems, each device is connected to a system bus, in parallel, usually by the use of several stack able cables. Refer to the figure for a diagram of a hypothetical system. A full set of connections is 24 (16 si
21、gnals plus shield and ground returns), as tabulated below and also in the Standard. Suitable cables, stack able at each end, are available from Component Manufacturing Service, Inc., West Bridgewater, MA 02379, U.S.A. (Their part number 2024/1 is for a 1- meter-Iong cable.) This instrument will func
22、tion as either a TALK/LISTEN or a TALK ONLY device in the system, depending on the position of the TALK switch. TALK/LISTEN denotes full programmability and is suited for use in a system that has a controller or computer to manage the data now. The handshake routine assures that the active talker pr
23、oceeds slowly enough for the slowest listener that is active, but is not limited by any inactive (unaddressed) listener. TALK ONLY is suited to a simpler system -e.g. Digibridge and printer -with no controller and no other talker. Either mode provides measurement results to the active listeners in t
24、he system. 2-8 INSTALLATION Figure 2-5. The handshake process, illustrated by timing diagrams of the pertinent signals for a system with one talker and several listeners. For details, refer to the standard. 2.8.2 Interlace Functions Figure 2-5. The following functions are implemented. Refer to the S
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 1692 Digibridge 电路图
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


