LabGruppen Check_list_after_service_class_TD电路图.pdf
《LabGruppen Check_list_after_service_class_TD电路图.pdf》由会员分享,可在线阅读,更多相关《LabGruppen Check_list_after_service_class_TD电路图.pdf(10页珍藏版)》请在收音机爱好者资料库上搜索。
1、 Modified: 2008-04-16 Page 1 of 10 THIS DOCUMENT IS CONFIDENTIAL. IT MAY NOT BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF Lab.gruppen AB 2006 Lab.gruppen AB, Faktorvgen 1, S-434 44 KUNGSBACKA, SWEDEN Checklist after service of class TD LAB 2000, LAB 2000C, LAB 2002, LAB 4000, fP 3400 & fP 6400 Cr
2、eated by: Patrick Bergwall Date: 2006-12-15 RadioFans.CN 收音机爱 好者资料库 Modified: 2008-04-16 Page 2 of 10 THIS DOCUMENT IS CONFIDENTIAL. IT MAY NOT BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF Lab.gruppen AB 2006 Lab.gruppen AB, Faktorvgen 1, S-434 44 KUNGSBACKA, SWEDEN Index 1 INTRODUCTION.3 2 CHECK
3、 LIST CLASS TD.3 RadioFans.CN 收音机爱 好者资料库 Modified: 2008-04-16 Page 3 of 10 THIS DOCUMENT IS CONFIDENTIAL. IT MAY NOT BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF Lab.gruppen AB 2006 Lab.gruppen AB, Faktorvgen 1, S-434 44 KUNGSBACKA, SWEDEN 1 Introduction This checklist shall be used to make sure
4、the amplifier is always checked in a proper way after service has been done. It is important to follow the steps in this check list and check all points so that the set up of parameters in the amplifier is correct adjusted. When have done all checks and adjusted the parameters the amplifier will wor
5、k properly and will have the output power that it is designed for. 2 Check list class TD Always clean the amplifier by blowing with compressed air through coolers and fans. Be careful when blowing where big electrolytic capacitors are placed so that the capacitor doesnt get damaged. If HF- or LF-uni
6、ts have been repaired, always turn the potentiometers fully counter clockwise on HF-unit before starting the amplifier up (step 1). RadioFans.CN 收音机爱 好者资料库 Modified: 2008-04-16 Page 4 of 10 THIS DOCUMENT IS CONFIDENTIAL. IT MAY NOT BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF Lab.gruppen AB 2006
7、Lab.gruppen AB, Faktorvgen 1, S-434 44 KUNGSBACKA, SWEDEN 1) After repair always start the amplifier with current potentiometer (VR3) in mains power circuit. On is clockwise (cw) and off is counter clockwise (ccw). Check that the switch pulse is normal. 300V line should increase some volts when rela
8、y clicks. Measure step 2 under start up. Measuring points. VR3 Modified: 2008-04-16 Page 5 of 10 THIS DOCUMENT IS CONFIDENTIAL. IT MAY NOT BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF Lab.gruppen AB 2006 Lab.gruppen AB, Faktorvgen 1, S-434 44 KUNGSBACKA, SWEDEN 2) Measure that 16V is correct bala
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- LabGruppen Check_list_after_service_class_TD 电路图
收音机爱好者资料库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。



Marshall-9100-62-02-Schematic电路原理图.pdf


